Background:
The project involved the construction of a 110kV double-circuit overhead transmission line in a coastal region of Southeast Asia. The hilly terrain required precise tension control and reliable braking performance.
Galaxy’s Solution:
Galaxy supplied the GL1×50 hydraulic tensioner, CS series stringing blocks, and anti-twisting steel rope, along with full technical guidance. The closed-loop hydraulic system ensured consistent tension during continuous operation.
Results:
30% improvement in stringing efficiency;
No conductor damage and smooth operation;
High customer satisfaction with system stability and ease of operation.